Creation of constraints and operating links
The constraints that were created in the general assembly made it possible to preposition the origins and construction benchmarks linked to the design of the parts associated with their interdependence relationships.
They will be successively replaced by the mechanical connections allowing the operation of the mechanism.
Creating connections between parts of the design
Creating connections with ''purchased'' parts |
Arms' installation, adjustments, tests |
|||
Conclusion: animation test . The entire project was carried out without any calculations!